Search Results for: building permit
460 results found.
Final-DRAFT-2020-PLAN-Binder1
[…] Stormwater Management Plan and Development Permit shall be submitted prior to the issuance of a Building Permit. The quality, qual ity, and type of materials used in stormwater infrastructure can be […]
https://www.rothesay.ca/wp-content/uploads/2020/08/Final-DRAFT-2020-PLAN-Binder1.pdf
PDF document
Building / Development Permit Application
[…] Starting Date: _____________ Project Location Address Development Officer Signature : APPROVALS Development Permit Required with Building permit application Property Identification No. (PID): Please circle applicable items for your project below and […]
https://www.rothesay.ca/wp-content/uploads/2017/11/Buiding-Permit-Application-Project-Final.pdf
PDF document
Final-DRAFT-2020-PLAN-Binder1
[…] Stormwater Management Plan and Development Permit shall be submitted prior to the issuance of a Building Permit. The quality, qual ity, and type of materials used in stormwater infrastructure can be […]
https://www.rothesay.ca/wp-content/uploads/2021/01/Final-DRAFT-2020-PLAN-Binder1.pdf
PDF document
2019WaterBylawFULLconsolidation
[…] “Specifications for Developers” and shall be paid in full prior to the issuance of a building permit. SYSTEM ACCESS FEES 7.11 Every person connecting to the water system shall pay a […]
https://www.rothesay.ca/wp-content/uploads/2019/04/2019WaterBylawFULLconsolidation.pdf
PDF document
DRAFT Water By-law 1-18
[…] “Specifications for Developers” and shall be paid in full prior to the issuance of a building permit. SYSTEM ACCESS FEES 7.11 Every person connecting to the water system shall pay a […]
https://www.rothesay.ca/wp-content/uploads/2018/12/DRAFT-Water-By-law-1-18.pdf
PDF document
Property Questions / Standards & Procedures – FAQ
Q: My neighbor’s property doesn’t meet neighbourhood standards (i.e., building not maintained, lawn is not cut, garbage and neglected vehicles, other types of waste); is there anything the Town can […]
https://www.rothesay.ca/faq/property-questions-standards-procedures-faq/
2025August11OpenSessionFINAL_Redacted
[…] because the windows would suffice by building code standards which would be confirmed during the building permit process. Casey Hoogeveen, 26 Chapel Road, stated his opposition to the project noting he […]
https://www.rothesay.ca/wp-content/uploads/2025/01/2025August11OpenSessionFINAL_Redacted.pdf
PDF document
Forms
Building / Development Permit Application Subdivision Application Planning Advisory Committee Application Sign License Application Community Event Signage Electronic Sign Form (Rothesay Road) Application for a Certificate of Appropriateness Rothesay […]
A By-law Respecting Signage in Rothesay (Consolidation)
[…] be made to the Development Officer and shall include: a) The civic address of the building, structure or lot on which the sign is to be erected, altered, or relocated; […]
https://www.rothesay.ca/wp-content/uploads/2017/11/By-Law-3-10-Signage-consolidation-2014.pdf
PDF document
3 2022Feb3PACStaffRpt
[…] from time to time, tobe paid tothe Town twelve (12) months following the issuance ofthe building permit. 20. The Developer agrees that the Town does not guarantee and nothing in this […]
https://www.rothesay.ca/wp-content/uploads/2022/03/3-2022Feb3PACStaffRpt.pdf
PDF document









