Search Results for: building permit
458 results found.
2018May14OpenSessionMinutes
[…] areas in the proposed Seniors Resource Centre in Town 1-lall. CARRIED. 7.11 April 2018 Monthly Building Permit Report MOVED by Counc. Lewis and seconded by Counc. Wells the Monthly Building Permit […]
https://www.rothesay.ca/wp-content/uploads/2018/07/2018May14OpenSessionMinutes.pdf
PDF document
July-2016-Open
[…] Advisory Committee Meeting Minutes dated 27 June 2016 be received/filed. CARRIED. 7.8 June 2016 Monthly Building Permit Report MOVED by Deputy Mayor Alexander and seconded by Counc. Wells the Monthly Building […]
https://www.rothesay.ca/wp-content/uploads/2017/11/July-2016-Open.pdf
PDF document
2018Feb12OpenMinutes
[…] reference to individuals. CARRI ED. Counc, Lewis returned to the meeting. 7.10 January 2018 Monthly Building Permit Report MOVED by Counc. Wells and seconded by Coune. McGuire the Monthly Building Permit […]
https://www.rothesay.ca/wp-content/uploads/2018/03/2018Feb12OpenMinutes.pdf
PDF document
2025Feb10 OpenMinutesFINALtemp
[…] staff on completing the intensive process for the membrane installation. CARRIED. 11.6 January 2025 Monthly Building Permit Report MOVED by Counc. Shea and seconded by Deputy Mayor Alexander the January 2025 […]
https://www.rothesay.ca/wp-content/uploads/2025/03/2025Feb10-OpenMinutesFINALtemp.pdf
PDF document
2016 Annual Report
[…] Rothesay did not experience as much development in 2016 as in some previous years, 322 building permits valued at over $11M were issued; this was a decline in value of 30% […]
https://www.rothesay.ca/wp-content/uploads/2017/11/2016-Annual-Report.pdf
PDF document
2024Oct15 OpenSessionMinutesFINAL
[…] QUESTION: It was reported that speed signs have been installed. CARRIED. 7.8 September 2024 Monthly Building Permit Report MOVED by Counc. Mackay French and seconded by Counc. Lewis the September 2024 […]
https://www.rothesay.ca/wp-content/uploads/2024/11/2024Oct15-OpenSessionMinutesFINAL.pdf
PDF document
A By-law of the Municipality of Rothesay to Regulate Traffic
[…] unattended, within 6 metres of the exterior wall of a mall or plaza or other building where a fire lane has been designated. BUS STOPS 19. Any bus operated or […]
https://www.rothesay.ca/wp-content/uploads/2017/11/03-3.pdf
PDF document
2024Jan15ScottAveHrgMINUTESfinal
[…] of renovations for the replacement of windows, roof repairs, and construction of a deck. A building permit was acquired for the deck and the interior renovations do not appear substantial, but […]
https://www.rothesay.ca/wp-content/uploads/2024/02/2024Jan15ScottAveHrgMINUTESfinal.pdf
PDF document
2023Dec11 Open Session MINUTES
[…] Family Residential R1B zone to the Two-Family Residential Zone . CARRIED. 7.6 November 2023 Monthly Building Permit Report MOVED by Counc. Mackay French and seconded by Counc. Lewis the November 2023 […]
https://www.rothesay.ca/wp-content/uploads/2024/01/2023Dec11-Open-Session-MINUTES.pdf
PDF document
2023September11OpenSessionFINAL_Redacted
[…] Drive PID s 00 065201 & 30347942 (see item 9.1) 7. 5 August 2023 Monthly Building Permit Report 7. 6 7 September 202 3 Capital Projects Summary 8. UNFINISHED BUSINESS TABLED […]
https://www.rothesay.ca/wp-content/uploads/2022/12/2023September11OpenSessionFINAL_Redacted.pdf
PDF document