Search Results for: building permit
486 results found.
2 2022DraftAgrmtClarkGPRoad
[…] time, to be paid to the Town twelve (12) months following the issuance of the building permit. Development Agreement Clark and Gondola Road Page 3 of 10 13. The Developer agrees […]
https://www.rothesay.ca/wp-content/uploads/2022/07/2-2022DraftAgrmtClarkGPRoad.pdf
PDF document
2021Feb2PublicHrgMPlanFINAL_Redacted
[…] clause 3.3. DESIGN AND APPEARANCE OF BUILDINGS AND STRUCTURES which states as follows: “No residential building with a length to width ratio of greater than three may be erected or […]
https://www.rothesay.ca/wp-content/uploads/2021/01/2021Feb2PublicHrgMPlanFINAL_Redacted.pdf
PDF document
Building Inspector – Job Posting
[…] of construction, renovation and demolition, investigating complaints and reports of non -compliance, reviewing and approving building permit applications and responding to inquiries, complaints and request for information in a timely manner. […]
https://www.rothesay.ca/wp-content/uploads/2025/06/Building-Inspector-–-Job-Posting.pdf
PDF document
2 2022Dec5 50 HamptonAgrmt
[…] time, to be paid to the Town twelve (12) months following the issuance of the building permit. 25. The Developer agrees that the Town does not guarantee and nothing in this […]
https://www.rothesay.ca/wp-content/uploads/2022/12/2-2022Dec5-50-HamptonAgrmt.pdf
PDF document
2 DRAFTAgrmt145Hampton
[…] time, to be paid to the Town twelve (12) months following the issuance of the building permit. 14. The Developer agrees that the Town does not guarantee and nothing in this […]
https://www.rothesay.ca/wp-content/uploads/2022/03/2-DRAFTAgrmt145Hampton.pdf
PDF document
Monday April 12 Open session
[…] approval was the prohibition of amplified music on the patio. CARRIED. 7.7 March 2021 Monthly Building Permit Report MOVED by Counc. Lewis and seconded by Deputy Mayor Alexander the March 2021 […]
https://www.rothesay.ca/wp-content/uploads/2021/06/Monday-April-12-Open-session.pdf
PDF document
MRP-August-2009
[…] off -season. Its flexible design allows for more community needs to be met in one building and it can also accommodate emerging recreation trends. If planned as part of a […]
https://www.rothesay.ca/wp-content/uploads/2017/11/MRP-August-2009.pdf
PDF document
Sagamore Point Development Agreement REZONING TO R2 DRAFT
[…] municipal services as specified herein. 5. The Developer agrees that Rothesay shall not issue a building permit to the Developer for work directly connected with the development of the Lands, nor […]
PDF document
2026January12OpenSessionFINAL_Redacted
[…] 15-17 Chapel Road â Rezoning (see January 19 th Public Hearing) 11.5 December 2025 Monthly Building Permit Report 12. UNFINISHED BUSINESS TABLED ITEMS 12.1 Rothesay Arena Open House (Tabled September 2021) […]
https://www.rothesay.ca/wp-content/uploads/2026/01/2026January12OpenSessionFINAL_Redacted.pdf
PDF document
2 DraftAgrmtHamptonWoodland
[…] time, to be paid to the Town twelve (12) months following the issuance of the building permit. 27. The Developer agrees to carry out subject to inspection and approval by Town […]
https://www.rothesay.ca/wp-content/uploads/2022/03/2-DraftAgrmtHamptonWoodland.pdf
PDF document








