Search Results for: building permit
478 results found.
Building Inspector – Job Posting
[…] of construction, renovation and demolition, investigating complaints and reports of non -compliance, reviewing and approving building permit applications and responding to inquiries, complaints and request for information in a timely manner. […]
https://www.rothesay.ca/wp-content/uploads/2025/06/Building-Inspector-–-Job-Posting.pdf
PDF document
2 2022Dec5 50 HamptonAgrmt
[…] time, to be paid to the Town twelve (12) months following the issuance of the building permit. 25. The Developer agrees that the Town does not guarantee and nothing in this […]
https://www.rothesay.ca/wp-content/uploads/2022/12/2-2022Dec5-50-HamptonAgrmt.pdf
PDF document
2 DRAFTAgrmt145Hampton
[…] time, to be paid to the Town twelve (12) months following the issuance of the building permit. 14. The Developer agrees that the Town does not guarantee and nothing in this […]
https://www.rothesay.ca/wp-content/uploads/2022/03/2-DRAFTAgrmt145Hampton.pdf
PDF document
Monday April 12 Open session
[…] approval was the prohibition of amplified music on the patio. CARRIED. 7.7 March 2021 Monthly Building Permit Report MOVED by Counc. Lewis and seconded by Deputy Mayor Alexander the March 2021 […]
https://www.rothesay.ca/wp-content/uploads/2021/06/Monday-April-12-Open-session.pdf
PDF document
MRP-August-2009
[…] off -season. Its flexible design allows for more community needs to be met in one building and it can also accommodate emerging recreation trends. If planned as part of a […]
https://www.rothesay.ca/wp-content/uploads/2017/11/MRP-August-2009.pdf
PDF document
2026January12OpenSessionFINAL_Redacted
[…] 15-17 Chapel Road â Rezoning (see January 19 th Public Hearing) 11.5 December 2025 Monthly Building Permit Report 12. UNFINISHED BUSINESS TABLED ITEMS 12.1 Rothesay Arena Open House (Tabled September 2021) […]
https://www.rothesay.ca/wp-content/uploads/2026/01/2026January12OpenSessionFINAL_Redacted.pdf
PDF document
2 DraftAgrmtHamptonWoodland
[…] time, to be paid to the Town twelve (12) months following the issuance of the building permit. 27. The Developer agrees to carry out subject to inspection and approval by Town […]
https://www.rothesay.ca/wp-content/uploads/2022/03/2-DraftAgrmtHamptonWoodland.pdf
PDF document
Street Disturbance Permit
[…] the Streets and Sidewalks B y-Law. I/W e are aware of the requirements of Rothesay Building By-Law, Number 4-99, and my/our responsibilites thereunder, and I/we agree to use the above […]
https://www.rothesay.ca/wp-content/uploads/2025/09/Street-Disturbance-Permit.pdf
PDF document
Water Connection Permit
[…] S ystem. PROPERTY OWNER(S): PHONE: (HOME) (BUSINESS) EMAIL ADDRESS: PROPERTY LOCATION: Civic: PID# TYPE OF BUILDING: PURPOSE: PROPOSED DATE OF HOOK-UP: 1. I/We represent that I am/we are the legal […]
https://www.rothesay.ca/wp-content/uploads/2025/09/Water-Connection-Permit.pdf
PDF document
Sewage Connection Permit
[…] tem. PROPERTY OW NER(S): PHONE: (Home) (Business) EMAIL ADDRESS: PROPERTY LOCATION: Civic: PID# TYPE OF BUILDING: PURPOSE: PROPOSED DATE OF HOOK-UP: 1. I/We represent that I am/we are the legal […]
https://www.rothesay.ca/wp-content/uploads/2025/09/Sewage-Connection-Permit.pdf
PDF document








